| 29.11.2011 Olde carriage realty |
Finally they permitted the handling and erection of the forms and reinforcement in large units. Thus a column form would be assembled complete at the mill, moved as a unit by car to the proper shaft and then hoisted and set in place as a unit by the derrick. Girder forms, floor slab forms, girder ...
|
| 28.11.2011 Sa real estate |
Thus, two forms could be raised and filled almost every day. The construction of the forms and of the gallows frames is shown by Figs. The cost of one set of forms and gallows frames was sa real estate as follows: 320 ft. at $30 12.48 4 sills 6×8 ins.×16 ft., 2 caps 6×6 ins.×9 ft., 4 braces 6×6 ...
|
| 27.11.2011 Japan real estate |
A section of one of the conduits showing the form construction and the arrangement of the reinforcement is given by Fig. The method and cost of construction are given as follows, by Mr. J.] "The particular japan real estate thing that was insisted upon by both Mr. Sherrerd, the chief engineer of ...
|
| 26.11.2011 Sta lucia realty |
Rearward projecting lips e are secured to the lagging at the rear end of the mold and on each side of the timber G. The diaphragms F have each two arms f which project horizontally beyond the surface of the inner mold and engage the tracks D; locking dogs H are pivoted to the arms f so as to hook ...
|
| 26.11.2011 Elders real estate |
This rock foundation was taken advantage of to reduce the amount of invert concrete. In constructing the sewer proper the invert was first concreted to real estate maine template to the height shown in Fig. Both templates and arch forms were constructed of wood. The arch forms were moved ahead on ...
|
| 26.11.2011 John rea realty |
on a curve, gave for the cost of the brick work at sides the same result as above, but the inspector's record of men working on concrete backing at sides showed a less cost, as follows: 4 men mixing at $1.75 $7.00 2/3 time man lowering at $2.25 1.50 1 man in bottom 1.75 ----- $10.25 They ...
|
| 25.11.2011 Properties.com |
Several pipes also had killam properties to be placed in the concrete. Excavation.--The excavation was made with pick and shovel and the material hauled away in carts, the distance to the dump being 700 ft. The top was shoveled directly into the carts, while property owners the rest was handled ...
|
| 24.11.2011 Property information |
M., @ $18.30 1.85 Labor on forms 2.41 Labor on concrete and steel 2.65 ------ Total $15.62 The cost of a foreman is not included in this, as the contractor looked after the men himself. Waterproofing.--The waterproofing of the structure proved a serious problem. It was thought at first that the ...
|
| 24.11.2011 Premise bbs |
It was mounted so it could discharge into dump cars on a service track laid on the ground. A double hopper was built up over the mixer, one compartment for sand and one for broken stone. The end of a service track leading from the side track was laid on an inclined trestle up to a floor level with ...
|