The method in detail of constructing curb and gutter, with this type of form, at Ottawa, Ont., is described in a succeeding section. Here the joints were formed by inserting a partition of 3/8-in. boiler plate every buxton real estate 12 ft., which was withdrawn just previous to finishing up the ...
|
| 05.12.2011 Findaproperty.com |
After the water table had been troweled down and brushed a 1×10-in. This board was sustained by small "knee frames" made of three pieces of 1×2-in. stuff, one conforming to the slope of the water table and long enough to extend beyond the front of the 2×6-in. front board, a second standing plumb ...
|
| 04.12.2011 Google real estate |
0.10 Interest and depreciation of $1,800 plant at 20% per annum 0.09 Train service, 0.03 day work train at $25 0.75 Summary concrete side walls-- Per cu. Materials $3.16 Labor on concrete 0.84 Labor removing timber, etc. 0.95 Train service 0.75 Miscellaneous 0.34 ------- Total $6.04 In the two ...
|
| 04.12.2011 Free real estate information |
gravel and sand-- 2-horse team and driver, 210 days at $3.60 $756.00 $0.183 2-horse team and driver, 4½ days at $4 18.00 0.005 ------- ------ Total $774.00 $0.188 As there were 1.185 cu. of gravel per cubic yard of concrete the free real estate information cost of gravel per cubic yard of ...
|
| 04.12.2011 Goldfields realty |
23,888 3.58 -------- ------ Total $51,308 $7.69 Averaging the work we have 15,491 cu. Four-Track Subway.--On two sections of four-track subway the labor cost of mixing and placing concrete similarly divided was as follows: Section A. Labor mixing $0.97 $0.94 Labor placing 0.96 0.95 Power 0.14 ...
|
| 04.12.2011 Find property |
The derrick and roof arch travelers were then moved into position between the finished walls, and the arch traveler was jacked up and aligned. Skip cars coming from the mixer were run under the derrick traveler, where the skips were lifted by the derrick and set on the platform cars to be run ...
|
| 03.12.2011 Trademe property |
Carpenters did all the framing, and erected it with the help of laborers. All the carrying of the lumber was done by laborers. This reduced the cost of the work, as the laborers' wages amounted to one-third of the whole cost. As soon as the forms were all in place, which was before the mixing of ...
|
| 03.12.2011 Buxton real estate |
For high and long spans a derrick is sometimes needed for the work of placing the centering. On these jobs the concrete was made so wet that with the proper tamping and cutting of the concrete in the forms the surfaces were so smooth that no plastering was needed. ~MOLDING SLABS FOR GIRDER ...
|
| 02.12.2011 Mackay real estate |
They were cast in wooden molds with collapsible sides held together by iron rods. Each mold was mackay real estate provided with six bottoms so that the molded block could be left standing on the bottom to harden while the side pieces were being used for molding another block. The molding was done ...
|
| 01.12.2011 North iowa realty |
Coal at $4 per ton $210 Machinery, tools and cartage 283 Labor 497 ---- Total $990 This gives a cost of $9 per day for pumping. $ 375 17.6 north iowa realty Tools 69 3.3 Labor at $1.75 1,687 79.1 ------ ----- Total $2,131 100.0 Filling 5,711 cu. Earth $1,142 $0.20 Labor including riprapping ...
|
| 30.11.2011 Zimmerman realty |
Lining zimmerman realty girder forms and lining and plumbing column and wall forms is high-class carpenter work and should be directed by competent carpenters. A column or girder which is out of line or plumb not only looks bad but may be required to be removed and corrected by the engineer. The ...
|