| 05.12.2011 Immovable property valuation |
Such a course of reasoning indicates that the best results should be expected where the curb and water table are built in one piece and in sections of reasonable length separated by expansion joints. 121.--Box Form for Concrete Curb.] [Illustration: Fig. 122.--Continuous Form for Concrete Curb.] ...
|
| 05.12.2011 Premises yabb |
a day, so that the cost of placing the forms was $1 per cu. The 2 men placing and tamping cinders averaged 16 cu. This curb and gutter was built by contract at 45 cts. For several jobs, in which a curb and gutter essentially the same as shown in Fig. 125 was built, our records show a general ...
|
| 05.12.2011 Premises maintenance |
127.--Traveling Derrick for Constructing Side and Center Walls, Capitol Hill premises maintenance Tunnel.] [Illustration: Fig. 128.--Steel premises maintenance Forms for Side Walls for premises maintenance Capitol Hill Tunnel.] ~METHOD OF LINING CAPITOL HILL TUNNEL, PENNSYLVANIA R. C.~--The ...
|
| 05.12.2011 Stouffer realty |
The timbering in this section was cut out and excavation made for the property info wall footing. Two temporary posts FF were then set up, fastened by hook bolts L and lagged behind to make the wall form. sections were cut out at once, each two being separated by a 5-ft. 130 was then run alongside ...
|
| 04.12.2011 Real escapes properties |
136.--General Plan of Centers for Roof Arch, Hodges' Pass Tunnel.] The construction of the centering for the roof arch is shown by Figs. 137 giving detail dimensions of the ribs and lagging. Each rib consists real escapes properties of two side posts and an arch piece. The side posts on each ...
|
| 03.12.2011 Immovable |
diameter and cost $30 each, being the most expensive part of the derrick. The derrick was made on the ground and took four carpenters between 3 and 4 days to build. of service track, including pole trestle across the stream, cost between $600 and $800. The derrick was moved by means of a cable ...
|
| 02.12.2011 Shorewest realty |
The side and end pieces were removed in about a week or ten days, but the slabs stood on the floor 90 days, being wetted each day shorewest realty for two weeks after molding. The plant for mixing and handling the shorewest realty concrete was mounted on cars. A flat car had a rotary drum mixer ...
|
| 02.12.2011 Recording parties |
per lb., and the cost of shaping recording parties and placing it 0.2 ct. Mixing and Placing Concrete.--A Ransome mixer holding a half-yard batch was used. The concrete for the piers was a mixture of 1 property data part Portland cement to 7 parts gravel; for the arches, the concrete was mixed 1 ...
|
| 02.12.2011 Immovable property |
Only one spike was driven to hold each rail to each tie, the spikes being on alternate sides of the rail in successive ties. No fish plates or splice bars were used to join the rails, which considerably simplifies the track laying. 162.--Trestle for Service Track.] Two lines of track were laid ...
|
| 01.12.2011 Real estate pei |
Based on the use of only two forms with two laborers removing and refilling them each day, and on the assumption that a single set of forms costing $40 can be used only 50 times before being replaced, Mr. pipes as follows: 2 per cent, of $40 for forms $0.80 1.1 cu. 2.80 ----- Total per pipe ...
|
| 01.12.2011 Philippines real estate |
In this construction lagging boards the full length of the column are used and are held without nails by yokes. The yokes consist of two heads of wood held together by threaded rods with nuts; between the rods and the lagging are struts or blocks serving both as spacers and to hold the lagging to ...
|