| 05.12.2011 Google properties |
~PROTECTION OF WORK FROM SUN AND FROST.~--Sun and frost cause scaling and hair cracks. For work in freezing weather the water, sand and gravel should be heated or salt used to retard freezing until the walk can be finished; it may then be protected from further action of the frost by covering it ...
|
| 05.12.2011 Real estate data service |
All these constructions have been satisfactory; the pavement is not slippery. The cost to the city by contract for the three-layer construction has in two cases been as follows: Church St., 8,000 sq. 1-2-4 and ½-in 1-2 mixture 0.32 Excavation 0.10 ----- Total $0.99 Albert and Wyandotte Sts., ...
|
| 05.12.2011 Walla walla real estate |
It was also necessary to maintain a watchman on this work, which duty, under ordinary circumstances, would be done by the general watchman. The total length built was 1,326 ft., of which 1,209 ft. The rates of wages paid were $2 for horse and cart, $1.65 for watchman, and an average of $1.90 per ...
|
| 04.12.2011 Skogman realty |
In the tunnel a traveling platform was constructed on two standard gage flat cars so coupled that a platform 100 ft. long and slightly narrower than the clear space between side wall forms was obtained. Connecting the end of the platform toward the mixing plant was a rampe or inclined platform ...
|
| 03.12.2011 Sotheby real estate |
It consists sotheby real estate of five parts: (1) Six concrete piers running the full width of the bridge upon which the structure was moved; (2) a steel framework up to E G, called the "primary bent"; (3) a separate timber portion below the heavy lines E I and W' I'; (4) the "main staging" ...
|
| 03.12.2011 Online home search |
The sand and gravel were excavated from a pit 4½ miles away and delivered online home search by electric cars to the bridge site at a cost of 50 cts. span Lambert non-residential premises cableways set parallel with the bridge, premises send message one 25 ft. each side of the center axis, were ...
|
| 03.12.2011 Integra realty resources |
The concrete for the abutment adjacent to the mixer was handled in buckets by a guy derrick. 152, was then built out from the mixer to the first pier; this trestle was so located as to clear the future bridge about 20 ft. and was carried out from shore parallel integra realty resources to the ...
|
| 03.12.2011 Property site |
Six cars were used and the concrete was dumped by them directly into the forms; the fall from the track above being in some cases 40 ft. The hoists and shuttle car property site were operated by an 8½×12-in. Lambert derrick engine, the boiler of which also supplied property site steam to the mixer ...
|
| 02.12.2011 Whatcom county real property search |
The proportions of the concrete were generally 1 cement, 3 gravel and 6 stone. The gravel was a material dug from the foundations and was about 50 per cent. The concrete was machine mixed and whatcom county real property search was mixed very wet. The work was done by the railway company's forces, ...
|
| 02.12.2011 Practice studios |
When the hoisting engine, which was set near the concrete mixer, began hauling the car along the track, a laborer would follow the car. Just before the car reached the post Q, he would unhook the hoisting practice studios rope from the front end of the car, then push the car past the post Q, hanna ...
|
| 01.12.2011 Premises send message |
The cement house was erected alongside the trestle at the wheeling platform level and a chute from an unloading platform at track level to the opposite end of the house enabled the bags to be handled directly from the car to the chute and thence run by gravity to the cement house. Sand and ...
|