| 05.12.2011 Premise viewtopic |
The tables in Chapter II give the amounts of materials per cubic yard of these mixtures; the product of these quantities and the cost of the materials on the ground gives the cost. The labor cost of mixing and placing, including the form work, will run from 10 to 14 cts. In round figures curb and ...
|
| 04.12.2011 Modi properties |
When hauled clear of the lining all but the first 3-ft. of lagging on each side was removed; they were then jacked into position. of concrete were laid at the following costs for labor and materials: Item. 1,303.20 0.668 Lumber-- Mixing platforms and runways 336.89 0.174 Ribs, including hand ...
|
| 04.12.2011 Real property tax maui |
The arrangement is shown roughly by the sketch, Fig. There was block and tackle for each corner post and a winch at each end of the car. The vertical movement of the platform was real property tax maui between 6 and 7 ft. The floor was cemented first, then the side walls and finally the roof arch. ...
|
| 03.12.2011 Properties in bulgaria |
The concrete was mixed on a platform at the foot of the mast. When ready for operation the chain on the carrier was hooked to the bucket of concrete, the engine started, and both bucket and cable raised, the former running by gravity to the pier. The speed of descent was governed by the height to ...
|
| 02.12.2011 Property week |
The skip cars were large enough for three skips but only two were carried so that the derricks could save time by depositing an empty skip in the vacant space and take a loaded skip away with one full swing of the boom. Altogether nine derricks were used in the bridge, four having 70-ft. These ...
|
| 02.12.2011 Kingsway realty |
After Sections 1, 2, 3 and 4 had been concreted they were allowed to set and then the struts and back forms were taken out and the intervening sections were concreted. The large Sections 6 and 7 were concreted in five sections each, in order to permit the taking out of the timber struts supporting ...
|
| 02.12.2011 Property partners |
Work on the centers and forms was tiresome owing both to the difficulty of moving around on the property partners lagging and to the cramped positions in which the men labored. Concrete.--A 1-7 bank gravel concrete was used for the abutments and a 1-5 bank gravel concrete for the other parts of ...
|
| 01.12.2011 Research your house |
Outside forms were used to confine the concrete at the haunches but nearer the crown they were not required. 174.--Hinged Cross Strut for Center for Culvert at Kalamazoo, Mich.] Much of the work was done when the thermometer, during working hours, ranged from 12° to 25° above zero. When the ...
|
| 30.11.2011 Movie premise |
This form runs quite low in lumber, requiring for a 9×12-in. The joists and lagging as shown require about 2 ft. The practice is to give these girder boxes a camber of ½-in. 198 is designed to provide adjustability, to enable quick erection and removal and to do away with all nailing. The ...
|
| 30.11.2011 Viewpoint realty |
Briefly described the bottom board is a single plank from 1 to 3 ins. thick, to which the side pieces are lag-screwed at the bottom. A third horizontal timber near the top serves as a seat for the ends of the joists carrying the slab lagging and is braced from the bottom horizontal by vertical ...
|
| 29.11.2011 Red oak realty |
(4) Take extreme care that beam and girder reinforcement is placed so that the bottom bars lie well above the bottom board of the mold; use metal or concrete block chairs for this purpose. (5) See red oak realty that the end connections and bearings of beam and girder frames are connected up and ...
|