| 27.11.2011 Ballarat real estate |
of conduit only one 8-hour shift per day was ballarat real estate worked. In December and January the plates had to remain in place three days, so that the progress was only 24 ft. per day; in warm weather this rate was increased to 40 ft. Costs were ballarat real estate kept on two sections of ...
|
| 27.11.2011 Premise send message |
{ Laying track for { steering alligator $ 5.00 $ premise send message 71.48 $ 43.98 $0.0670 $0.16 in the premises 4 men { Moving and erecting { superstructure 5.00 299.94 358.44 0.3821 0.93 4 men Moving plates 10.00 202.50 253.44 0.2646 0.65 Repairs to alligator 58.50 2.50 0.0354 0.08 1 man ...
|
| 27.11.2011 Kaufman realty |
yds., it was found that there was practically no difference in the cost of machine mixing and of hand mixing. conduit as an average of the three sizes, contained 20 cu. of expanded and required 125 bags of cement for a section 13½ ft. The cost of the work excluding excavation and profit, but ...
|
| 25.11.2011 Premises new thread |
The pipe was all of a 1-4 sand and cement mortar, and the amount of premises new thread cement in one foot of pipe was arrived premises new thread at by assuming that where the sand has voids in excess of premises new thread the cement used, the mortar will occupy 1.1 (see Chapter II) times the ...
|
| 24.11.2011 La real estate |
The location was made with very little difficulty, however, by an arrangement devised by the contractor which enabled the foreman, without property partners the aid of an engineer, to set the necessary grade and reference stakes. in diameter, was set very accurately and firmly in the ground at the ...
|